Plumbing
Unblock drainage (sinks/urinals/floor drains)
- Remove trap debris, rod/auger line, enzyme flush
- Checks: Free-flowing in ≤10s, no leaks/odour
Replace sink traps (bottle/P/S)
- Fit new trap and washers, align and seal
- Checks: Joints dry under full flow
Unblock toilet system (WCs/stacks)
- Plunge/auger; rod branch if needed; correct cistern fill/flush
- Checks: One-flush clear, no seepage at pan connector
Replace sinks/basins
- Deinstall, reseat with clips/silicone, reconnect taps/waste
- Checks: Level, continuous bead, no leaks (plug test)
Tap repairs/replacements
- Renew washers/cartridges; descale aerators; install new monoblocs with isolators
- Checks: Smooth action, no drips after 5 min
Cistern internals
- Replace inlet/flush valves or syphon; set waterline
- Checks: Refill <60s, no continuous flow
Urinal maintenance
- Descale lines, replace cartridges, verify sensors/solenoids
- Checks: Even rinse, odour-free
Re-silicone & re-bed wastes
- Remove failed sealant; rebond and reseal
- Checks: Uniform bead, no weeping
Install/replace isolation valves & label stops
- Fit/replace valves; label shut-offs
- Checks: Operable, no seepage
TMV service & outlet temps
- Clean/descale; set 41–43 °C; log readings
- Checks: Stable within ±2 °C
Legionella control
- Flush low-use outlets; temperature checks and records
- Checks: Hot ≥50 °C @1 min; cold ≤20 °C