Electrical
Lamps/fixtures & LED upgrades
- Replace failed lamps/drivers; standardise colour temperature (CCT)
- Checks: No flicker; matching colour across area
Emergency lighting tests
- Monthly function test; annual 3-hour duration test; log and repair defects
- Checks: All fittings pass required duration; records updated
Repair/replace sockets, switches, spurs, faceplates
- Isolate, test dead, re-terminate to spec; replace damaged/heat-marked accessories
- Checks: Polarity correct; CPC present; plates level; grommets fitted
RCD/RCBO checks
- Operate test buttons; schedule formal testing
- Checks: Trips within spec; labels/date stickers updated
Containment & cable management
- Refix trunking/tray; fit grommets/bushes; tidy and label circuits
- Checks: Lids secure; no sharp edges; IDs present
Controls & energy saving
- Install/commission PIRs, photocells, timers; set hold-on/timeout
- Checks: Sensors trigger/reset as intended
PAT testing programme
- Test and label appliances; remove fails from service; track remedials
- Checks: Records complete and current
EICR & remedials
- Arrange periodic inspection per use class; action C1/C2 promptly; plan C3 improvements
- Checks: Current certificate on file; defects closed out