Electrical

Lamps/fixtures & LED upgrades

  • Replace failed lamps/drivers; standardise colour temperature (CCT)
  • Checks: No flicker; matching colour across area

Emergency lighting tests

  • Monthly function test; annual 3-hour duration test; log and repair defects
  • Checks: All fittings pass required duration; records updated

Repair/replace sockets, switches, spurs, faceplates

  • Isolate, test dead, re-terminate to spec; replace damaged/heat-marked accessories
  • Checks: Polarity correct; CPC present; plates level; grommets fitted

RCD/RCBO checks

  • Operate test buttons; schedule formal testing
  • Checks: Trips within spec; labels/date stickers updated

Containment & cable management

  • Refix trunking/tray; fit grommets/bushes; tidy and label circuits
  • Checks: Lids secure; no sharp edges; IDs present

Controls & energy saving

  • Install/commission PIRs, photocells, timers; set hold-on/timeout
  • Checks: Sensors trigger/reset as intended

PAT testing programme

  • Test and label appliances; remove fails from service; track remedials
  • Checks: Records complete and current

EICR & remedials

  • Arrange periodic inspection per use class; action C1/C2 promptly; plan C3 improvements
  • Checks: Current certificate on file; defects closed out